Yeastar Technology NeoGate Guide d'installation Page 11

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 14
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 10
NeoGate TG Series Installation Guide
http://www.yeastar.com 11/14
3.2.3 Power Connection
Once users have made sure that device installation, cable connection and power type are correct, please
switch on the power. Then NeoGate will start booting. In the meantime, users would see that the POWER
and RUN indicator lights turn on.
Please switch off the power before plugging or unplugging the cables.
3.2.4 Indicators Status
When power is connected, users should be able to find that the Power indicator, RUN indicator, and GSM
port status indicator beside the slot that has installed SIM cards turn on.
Vue de la page 10
1 2 ... 6 7 8 9 10 11 12 13 14

Commentaires sur ces manuels

Pas de commentaire